Console starter catalog · EX06–EX15¶
All examples and learning routes
Use this catalog beside Configure → Load Example. Each example has its own guide, with the same name shown in the Console picker. The dedicated Design study starter supports bounded geometry and subsystem exploration through Studies. Open the guide beside the Console to follow the setup and inspect its results.
Run a starter¶
- Select Load Example and choose the named starter. The two diagnostic entries are in the Diagnostics group.
- Name the project and run so you can find them again. Leave the example inputs unchanged for the first run.
- Review Study → Generate CAD. It is enabled for EX07–EX15 and needs a compatible FreeCAD runtime on the server. EX06 leaves it off for a quick run.
- Validate the inputs, run the study, and follow its stage activity in the monitor.
- Open Evaluation, then the views listed in the guide below. To compare candidates, use Compare with to select another finished design.
Your first Console run illustrates the full workflow. Existing saved projects keep their CAD setting; load a fresh example to use the current defaults. Run time varies with the model and optional tools.
| Example guide | Focus |
|---|---|
| EX06 · Evaluation baseline | First run and assessment |
| EX07 · Microsatellite baseline | System budgets and fixed-panel CAD |
| EX08 · Compact electric spacecraft | Propulsion–power coupling |
| EX09 · Larger-bus study | Larger-payload budgets |
| EX10 · Topology trade: flat deck | Controlled comparison baseline |
| EX11 · Topology trade: spine | Alternative layout and comparison |
| EX12 · Tight-envelope diagnostic | Intentional failure and evidence |
| EX13 · Corrected packaging baseline | Complete diagnostic counterpart |
| EX14 · Symmetric deployable arrays | CAD, interior and deployment playback |
| EX15 · 42 mode timeline | Native ADCS and a 42 handoff |
These are concept studies under their authored environmental and operating cases. A complete score means the required evidence and eligibility checks close; it is not a claim of flight qualification, all-season orbit coverage or supplier certification. The compact, microsatellite, topology and larger-bus cases use explicit momentum unloading for 3,600 seconds per 5,400-second interval. Reassess when you change the operations or environment.
Illustrated results and specialist guidance¶
EX14: inspect CAD, reveal the interior and watch deployment.
EX08: compact electric-propulsion hardware and assumptions.
EX12: diagnose a tight envelope and EX13: inspect its complete counterpart. The downloadable EX01–EX05 studies reuse these maintained designs for the CLI, with their own fresh evidence. See shared example limits.