Planned real-mission cases

Status: research completed; reconstructions and numerical validation not yet performed. These cases are a future learning and validation route. There are no runnable mission downloads, Sindri predictions or accepted numerical agreements for them on this site.

The five worked studies exercise current capabilities with illustrative inputs. The mission portfolio below adds independent engineering references once each configuration can be reconstructed faithfully.

Priority Mission and intended comparison Translation into a Sindri study Remaining gate
1 CHEOPS 2013 design study: mass, mode power, energy and fixed-panel geometry Independently sourced payload/component drivers, mass ownership and margins, operating modes and EPS timeline Reconcile budget definitions and margins; obtain matching array/battery and hydrazine hardware. Keep the 2013 design separate from the flown configuration.
2 Proba-2: deployed-array energy and ground-data delivery Dated orbit/attitude modes, electrical hardware and cycle, RF paths, terminals and contacts Resolve source epochs, load states and usable battery energy. A resistojet cannot be substituted with a different electric-propulsion model.
3 GOMX-4B: ground-link closure coupled to electrical demand Matching RF hardware and terminal, elevation cases, transmitter loads and independently sourced generation Obtain hardware/load data and keep 4A/4B quantities distinct. Cold-gas propulsion and burn/wheel replay are outside the first comparison.
4 CYGNSS: one observatory's mass, energy and packaging Component records, EPS hardware/timeline, nadir operations and candidate wing geometry Resolve mass/power definitions, panel area and pack limits; confirm and faithfully represent propulsion absence. Constellation and retrieval performance are outside scope.
5 TET-1: attitude–thermal–power constraints Compare nominal/cooling attitudes with fixed hardware, loads and orbit; inspect temperature and ADCS consequences together Numerical comparison needs radiator/network data and appropriate Ni-H₂ battery treatment. Reported flight lessons are useful qualitatively already.

What will count as evidence

A published spacecraft total cannot serve simultaneously as a sizing input and an independent expected result. Each case will separate sourced inputs, assumptions, held-out comparison quantities and background context. A measured flight quantity, a design estimate and a platform allowance require different interpretation.

Before execution, freeze the source epoch, resolve material discrepancies and record missing capabilities. Set comparison tolerances from source precision and model applicability. Matching a number after tuning missing inputs would not establish predictive validity.

The initial research prioritizes integrated engineering questions. Isolated checks may support a case, but they do not replace a coherent mission snapshot or independent inputs.

Primary reading

Papers are linked, not redistributed. Their existence does not imply a completed Sindri reconstruction or independent replication of the mission's results.