Engineering and result glossary¶
Use this glossary when a result label or guide introduces an unfamiliar term. Field spellings and allowed values remain in the contract reference.
Run and result terms¶
| Term | Meaning in Sindri | Where to use it |
|---|---|---|
| Run bundle | The recorded inputs, indexed results, artifacts and execution history of a study | Find and share results |
| Manifest | The entry record that identifies the run and points to its indexes | Start here when opening a bundle |
| Artifact | A registered file, such as a report, diagnostic or geometry export | Follow its index entry and recorded integrity information |
| Resolved snapshot | The exact study inputs after references, resources and defaults have been resolved | Establish what was actually calculated |
| Lifecycle | The state of the whole run: running, completed, failed, incomplete or cancelled | Choose the next action in run control |
| Result availability | Whether a result is present and usable in full or in part, failed, skipped or absent | Check before reading its payload |
| Execution status | Whether an individual calculation succeeded, partially completed, failed or was skipped | Distinguish calculation problems from design constraints |
| Engineering assessment | A result's pass, warn, fail or not-assessed judgment against its represented checks | Review alongside quantities and issues |
| Applicability | Whether the model, hardware and assumptions fit the case being evaluated | Read before extending a result to another mission |
| Authority | The evidence and provenance supporting an input, model or catalog property | Evaluate estimate confidence |
| Convergence | Satisfaction of the numerical iteration's stopping rule | Review separately from engineering feasibility |
| Feasibility | Whether the design satisfies its applicable engineering requirements | Requires the relevant assessments and supporting evidence |
See interpret a result for a worked reading
sequence. A not_assessed result has no acceptance judgment.
Physical quantities and conventions¶
| Term | Meaning | Reading check |
|---|---|---|
| EPS | Electrical power system: generation, conditioning and storage | Power method |
| BOL / EOL | Beginning / end of life | Compare capacity and demand at the same lifetime point |
| State of energy | Stored battery energy, expressed in Wh | Distinguish it from installed capacity and an energy margin |
| State of charge | Stored charge fraction or percentage | Check the model's definition before equating it to energy fraction |
| Depth of discharge | Fraction of capacity drawn down | Review the battery's allowed range and lifetime assumptions |
| Dry / wet mass | Mass excluding / including the represented propellant load | Mass cases and margin rules |
| CG / inertia | Center of gravity / resistance to angular acceleration | Preserve configuration, reference point and axes |
| Topology | The selected structural layout used to arrange the spacecraft | A fixed choice is distinct from a search across candidates |
| Scenario / state | The operating case / physical configuration to which a result applies | Avoid mixing hot/cold cases or stowed/deployed configurations |
| Margin | Remaining capability relative to a demand or limit, using the stated convention | Read its sign, units and denominator; definitions vary by check |
Field suffixes commonly specify units: _w for W, _wh for Wh, _s for s,
_kg for kg, _m2 for m² and _deg for degrees. A fraction uses a 0–1 scale
unless its contract says otherwise. Temperatures in radiation equations use K;
a displayed temperature in °C must be converted before using it in those equations.